Mining, processing, transporting the finest Fairy Dust in the Realm!
Our Company
Company History
BNL Rail has gone through three phases in its development from a small rail line to a major company mining, processing, and transporting Fairy Dust.
In Phase One BNL Rail started, circa 7766 AB, as a small rail line in the Upper Lands transporting goods and passengers around the Upper Lake from Troll Ydor Barefoot Bridge to the Upper Land Forest. In 7770 AB, BNL obtained the exclusive rights from Troll Ydor to transport his raw Fair Dust from the mine under Barefoot Bridge.
In Phase Two BNL Rail was expanded through the Upper Land Forest to the Low Land Lake via intricate sets of trestles. BNL Rail became BNL Rail and Mining in 7790 AB when it acquired the rights to drilling sights near Barefoot Bridge. Processing facilities were developed near the Sorn's residence at the Lower Lake.
In Phase Three BNL Rail and Mining is in the process of building new mining facilities, and processing plants. It is hoped to have these projects completed in the next 4 seasons.
This site translated by Pzdork Ltd.      
Powered by WKM Associates
© 2009 WKM Associates All Rights Reserved